Villa Renovation
— 02 / VILLA RENOVATION

Villa Renovation in Dubai & Abu Dhabi

Complete villa strip-out, reconfiguration and refinishing.

FROM AED 350,000FIXED PRICE12-MONTH WARRANTY
— 01 / OVERVIEW

Villa Renovation

Villa Renovation from YP Interios is delivered by our own design, joinery and site teams working across Dubai and Abu Dhabi. Complete villa strip-out, reconfiguration and refinishing. Every project starts with a free site visit and ends with a joint snag list, photographic records and a 12-month workmanship warranty.

Most homeowners end up coordinating a designer, a workshop and several subcontractors themselves — which is where budgets slip and dates move. We hold the whole scope under one contract and one project manager.

— 02 / WHAT'S INCLUDED

Included as standard.

  • Free site visit, measurement and condition report
  • Drawings, finish schedule and 3D visuals where relevant
  • Supply and installation of all specified materials
  • Site protection, daily cleaning and waste removal
  • Joint snagging, sign-off and warranty documentation
— MATERIALS & SPECIFICATION
  • Moisture-resistant board and marine-grade substrates
  • Blum / Hettich hardware
  • Porcelain, travertine and natural stone
  • Jotun and Dulux paint systems
  • UV-stable and marine-grade external fixings

FROM AED 350,000

— 03 / BENEFITS

What you get with YP Interios.

01

Fixed-price contract issued after a measured site survey

02

In-house execution team, no unvetted subcontractors

03

Developer and municipality approvals prepared for you

04

12-month workmanship warranty on completion

— 04 / PROCESS

How the project runs.

  1. 01

    Free survey & condition report

    We inspect structure, waterproofing, MEP capacity and finishes before quoting.

    WEEK 0

  2. 02

    Scope, drawings & fixed quotation

    Room-by-room scope, layout drawings and a single fixed price.

    1–2 WEEKS

  3. 03

    Approvals & mobilisation

    Developer NOC, municipality permits, site protection and programme issued.

    2–4 WEEKS

  4. 04

    Strip-out, MEP & construction

    Demolition, first fix, blockwork, gypsum, tiling and joinery installation.

    6–20 WEEKS

  5. 05

    Snagging & handover

    Joint snag list, commissioning, deep clean and 12-month workmanship warranty.

    1 WEEK

— 05 / GALLERY

Recent work.

Villa Renovation project 1
Villa Renovation project 2
Villa Renovation project 3
— 06 / FAQ

Questions we are asked most.

Often yes. We phase the programme, screen dust-generating areas and keep a protected circulation route. For full villa strip-outs with MEP replacement we recommend moving out for the heaviest eight to ten weeks.

Yes, with a licensed structural consultant's drawings and municipality approval. Removing walls between kitchen and living areas is one of our most common requests.

A full bathroom rebuild including waterproofing, tiling, sanitaryware and a bespoke vanity typically starts at AED 35,000 and rises with stone and fitting selections.

We strip back to the slab, apply primer and membrane to specification, then flood-test for 24 hours with photographic records before any screed or tile is laid.

Only for changes you instruct in writing or genuine concealed conditions revealed after opening up, which are priced and approved before work continues.

Yes. Refurbishment packages for rental and resale are delivered to a fixed budget and a committed completion date.

— REQUEST / FREE QUOTE

Get a free quote

We'll call you back within one business day.

+971
— 08 / TALK TO US

Tell us about your project.

Free site visit, measured survey and a written fixed-price quotation within three working days.

CALLWHATSAPPGET QUOTE