Swimming Pool Construction
— 04 / SWIMMING POOL CONSTRUCTION

Swimming Pool Construction in Dubai & Abu Dhabi

Engineered pool shells, filtration and finishes with approvals handled.

FROM AED 180,000FIXED PRICE12-MONTH WARRANTY
— 01 / OVERVIEW

Swimming Pool Construction

Swimming Pool Construction from YP Interios is delivered by our own design, joinery and site teams working across Dubai and Abu Dhabi. Engineered pool shells, filtration and finishes with approvals handled. Every project starts with a free site visit and ends with a joint snag list, photographic records and a 12-month workmanship warranty.

Most homeowners end up coordinating a designer, a workshop and several subcontractors themselves — which is where budgets slip and dates move. We hold the whole scope under one contract and one project manager.

— 02 / WHAT'S INCLUDED

Included as standard.

  • Free site visit, measurement and condition report
  • Drawings, finish schedule and 3D visuals where relevant
  • Supply and installation of all specified materials
  • Site protection, daily cleaning and waste removal
  • Joint snagging, sign-off and warranty documentation
— MATERIALS & SPECIFICATION
  • Moisture-resistant board and marine-grade substrates
  • Blum / Hettich hardware
  • Porcelain, travertine and natural stone
  • Jotun and Dulux paint systems
  • UV-stable and marine-grade external fixings

FROM AED 180,000

— 03 / BENEFITS

What you get with YP Interios.

01

Fixed-price contract issued after a measured site survey

02

In-house execution team, no unvetted subcontractors

03

Developer and municipality approvals prepared for you

04

12-month workmanship warranty on completion

— 04 / PROCESS

How the project runs.

  1. 01

    Site visit & levels

    We check levels, drainage, soil, services and existing irrigation.

    WEEK 0

  2. 02

    Concept & 3D garden layout

    Zoning for pool, shade, dining and planting with a 3D view of the finished garden.

    1–2 WEEKS

  3. 03

    Approvals & fixed quote

    Pool and structure submissions where required, then a single fixed price.

    2–4 WEEKS

  4. 04

    Construction & planting

    Excavation, shell, hard landscaping, structures, irrigation, planting and lighting.

    6–16 WEEKS

  5. 05

    Commissioning & aftercare

    Water balancing, controller programming, handover training and maintenance plan.

    1 WEEK

— 05 / GALLERY

Recent work.

Swimming Pool Construction project 1
Swimming Pool Construction project 2
Swimming Pool Construction project 3
— 06 / FAQ

Questions we are asked most.

Twelve to sixteen weeks on site for a standard residential pool, plus approval time. Overflow pools and elevated shells take longer.

Yes. Pool construction requires submission and approval, which we prepare and lodge along with structural and MEP drawings.

We specify species proven in Gulf conditions — bougainvillea, frangipani, date and areca palms, ficus hedging and desert grasses — on zoned drip irrigation.

Powder-coated aluminium and motorised louvres for longevity, or treated hardwood where a warmer look is wanted. Coastal plots get marine-grade fixings.

Yes — re-tiling, re-plastering, new coping, and plant room upgrades including pumps, filtration and lighting.

We offer scheduled maintenance covering planting, irrigation, pool water balancing and lighting checks.

— REQUEST / FREE QUOTE

Get a free quote

We'll call you back within one business day.

+971
— 08 / TALK TO US

Tell us about your project.

Free site visit, measured survey and a written fixed-price quotation within three working days.

CALLWHATSAPPGET QUOTE